As it is correct to connect the electric meter single-phase

As it is correct to connect the electric meter single-phase

Housekeeping Hits: 150

Connection of the electric meter – business the difficult and demanding involvement of experienced experts. However those who have skills of mounting of electric equipment can try to install the device by the hands. In that case supervisory authorities will need only to check correctness of mounting, connection of the electric counter and to execute its sealing.

Types of electric counters

Upon purchase of the counter for independent connection it is necessary to make sure that the chosen model is allowed for operation. There are several types of metering devices. As loading distinguish single-phase (three-wire) and three-phase (three- and four-wire) models. In apartments and owner-occupied dwellings the first as household appliances work from single-phase network of 220 V are used.

Electric counters also differ on basis of design and are induction and electronic. Electronic are more reliable, compact and more exact (class of accuracy 0.5-2.0), now they force out induction metering devices.

As interfaces distinguish the following:

If the counter has to be installed out of rooms, it is better to buy the device with the electromechanical reading device. The fact is that at low ambient temperatures the liquid-crystal displays do not display information.

The chosen single-phase counter has to correspond to the loading specified in technical conditions. Before purchase of the device make sure that in documents the stamp of Quality Department is put down. On the body of the counter there has to be seal, the terminal cover will be sealed by the specialist of the power supplying company after mounting and connection.

Rules of installation of the electric counter

Before beginning installation of the metering device, it is necessary to study the Regulation for Electrical Installation (REI). Main requirements:

In multifamily house the counter can be installed on stair landing (in guard) or in the apartment (nearby at door). The installation site is usually regulated by the project. When mounting the electric meter in owner-occupied dwelling it is necessary that wires were looked through visually.

Consider that all works need to be performed at the disconnected tension. Face values of autoswitches and DPS (devices of protective shutdown) have to be picked up by the competent expert.

Components, tools

Mounting of the single-phase electric meter will require spare parts:

Spare parts have to be qualitative, safety of operation of electric equipment and devices depends on it.

To install the counter, it is necessary to prepare several tools:

Features of the scheme of connection

All single-phase counters are connected equally - directly in power chain (consistently). The scheme is usually specified in the passport or is on the metering device. It looks as follows:

Any model of single-phase electric counters has 4 terminals which are necessary for connection of wiring. The first – the phase coming the 2nd – the phase leaving the 3rd – zero coming the 4th – zero leaving. That is, the phase wire connects to terminal 1, zero - to terminal 3, tension is connected to electrical wiring from terminals 2 and 4.

Installation of the new device instead of old

To remove the old counter, disconnect input voltage on the device and execute rasplombirovaniye. Then remove terminal cover and by means of the screw-driver indicator check availability/lack of tension. Disconnect all 4 wires by means of the screw-driver. Further remove the counter.

Install the new device upside-down. Fix it instead of old, then connect 4 wires on device terminals. Close terminal cover. Check operation of the counter. For this purpose give tension and turn on some household appliance.

How to install the counter on the new place

It will be slightly more difficult to install the single-phase electric counter on the new place. Operations procedure:

Color of isolation can

For mounting bring each of cables to the terminal and tighten the first (top) screw. Check reliability of fastening. For this purpose pull for cable. Further tighten the second (lower) screw, wait some time and tighten screws once again.

On completion phase connect wires of loadings to automatic machines switches, and then zero, grounding to the corresponding tires. Then check correctness of assembly. It is recommended to entrust it to the experienced construction electrician.

If the single-phase counter is installed correctly, invite the specialist of the power supplying organization. It has to execute sealing of the introduction automatic machine switch and electric meter and to draw up the relevant statement. As a rule, all works from installation of the metering device before drawing up documents are carried out by the representative of the power supplying organization. If mounting and connection are carried out by the hands, before sealing ask the expert to check correctness of connection of the electric meter. It will allow to avoid various misunderstanding. After sealing it is possible to use the new metering device quietly.

Author: «MirrorInfo» Dream Team