How to build the dome house

How to build the dome house

Housekeeping Hits: 192

Dome houses gain popularity around the world. Advantages of streamline designs are obvious: durability, profitability, environmental friendliness. Spherical shapes allow to distribute evenly light, streams of warm indoor air. Dome houses are resistant to influence of external natural factors, including earthquakes.

It is required to you

Instruction

1. To build the dome house the hands quite perhaps therefore begin with preparation of the project. Carefully calculate all sizes in order to avoid the subsequent mistakes. Design design taking into account all communications.

2. After the approval of the project of the dome house, build the strong base of the corresponding form. For laying of the basis use modern materials: foam concrete or ceramsite blocks. Surely reinforce design iron couplers.

3. In the course of construction of the base lay necessary communications. For giving to the base of additional durability fill in box with cement. Wait for full skhvatyvaniye of the basis before on it to build the dome house.

4. From the center of the base establish wooden logs. On edge of circle fix radial "skirt" to which the dome will fasten subsequently.

5. The dome of the house can be constructed in two ways. Use With-shaped beams for installation of edges of future walls. Fix them among themselves by means of reveting. In this case the additional central support for roof collected from short beams can be required.

6. The second way of construction – reconstruction of geodetic dome. Bring together him from pieces of direct bar of different length. Connect parts among themselves by means of connectors. Such design does not demand additional support.

7. After construction of framework of the dome house start shingling of walls and floor wooden boards from within. Mark windows and doors. Warm floor and lay it.

8. Outside between beams place basalt cotton wool. Sheathe the dome house OSB plates. Cover dome with antibacterial and water-repellent solution. Sheathe ready dome bituminous tile.

9. Inside finish construction and finishing work. If on the project the second floor is conceived, make floor, establish ladder. Insert windows, hang doors, issue verandah handrail and porch.

Author: «MirrorInfo» Dream Team