How to build the two-storeyed house, without resorting to the help of professional crews? For this purpose it is necessary to think over carefully the project, to pick up optimum materials, and then to gradually carry out construction, accurately following the chosen project.

Instruction

1. Wishing to build the two-storeyed house, at first decide on its purpose as the construction method of country houses considerably differs from methods of construction of cottages for year-round accommodation. Planning construction of the reliable house, buy stone shell rock as the building from this material can be built in short time. Only the expert is capable to execute the full project of the building therefore buy the ready project or use the standard projects provided on the Internet or specialized editions.

2. To build the two-storeyed house the hands, first, begin with digging of trench on perimeter of future building and filling of concrete foundation which height is not less than a meter. At preparatory work outline perimeter of future building, and then level the surface of the site, having removed top soil. During creation of the base pay attention whether underground waters accumulate in trench, and in case of their identification go deep into the earth, having made the base higher and wide. Remember that the base has to be located under all load bearing walls, otherwise on them cracks can appear subsequently.

3. Having executed house basis waterproofing, start wall construction, accurately leveling each stone by means of special level and watching joints of corners, not forgetting to leave the place for door and window openings. After walls of the first floor are complete, use floor slabs or armature to create basis for the second floor of your house, and then start wall construction. Choosing the simplified option of arrangement of roof, use duo-pitch roof structure, covering it with normal slate.

4. Carrying out independent construction of the two-storeyed house, after construction of its box and mounting of roof build all internal partitions, mount ladder, get utilities in the building, and then start installation of windows and outer doors. After that carry out front works, warm external walls, and then trim them with structural plaster or inexpensive siding. You pass to internal works, carry out floor tie, alignment and putty of walls, and already final finishing, installation of interroom doors, facing of floor and walls and creation of interior will become completion phase.