How to calculate the pool

How to calculate the pool

If have decided to build own heavenly spot on the backyard of your house, then without pool not to do you. It is quite possible to build the small sea on the seasonal dacha though the similar invention and will cause several difficulties. Several councils how step by step to make the pool, and you are ready to work.

Instruction

1. Decide on the pool sizes. Do not forget that when choosing the size it is necessary to proceed not only from personal desires and available territories, but also money. You should put much more, than can seem - to dig out required area hole, to carry out isolation and to fill in concrete, to lay out tile and to carry out drain. Prepare for large number of expenses not only time and forces, but also money.

2. Go to shop behind selection of construction materials. Consult with the seller about what it is better for you to get. However the main set will be identical - concrete, tile, pipes. Other materials are accessory. These are support that the pool did not go to the earth, impervious layer that the concrete basis served longer, heating services and warming up of water and many other things. All this should be bought too, but already depending on your means and the sizes of your pool. Define that it is necessary for you and start construction.

3. This stage is not difficult, but it will take a lot of time. Dig through tunnels for future pipes which will bring water and connect all necessary equipment, make sure of its serviceability.

4. Dig out necessary deepening for the pool, on it a lot of time can leave. Remember that it is necessary to drip 20-30 cm more deeply, than the pool as these centimeters will be occupied by concrete, and other materials is supposed.

5. Fill in the turned-out form or order already ready form. This option is rather expensive, however will save from excess trouble.

6. Let's concrete dry completely - in warm weather it will take 3-5 days. After that begin to bring water supply and to stack tile. On the end of these procedures fill the pool and let 1 day stand to water. In a day carry out measurements whether passes the pool of water and vice versa whether dirt gets to it from somewhere. If everything works as it is necessary, can begin to use.

Author: «MirrorInfo» Dream Team


Print