How to carry out extract

How to carry out extract

Extract – the integral attribute of kitchen. It allows to prevent distribution of smells and evaporations not only in kitchen, but also on all house. Inhabitants of the apartment in which the extract is established can breathe the clean air which is not aggravated by fat connections. And furniture thanks to operation of this device will remain clean and tidy.

It is required to you

  • — gerforator;
  • — pencil;
  • — dowels;
  • — tape measure;
  • — level

Instruction

1. For full and productive work of extract it is necessary to bring its air duct to the street, having made opening in wall. Do not forget to coordinate the intention with self-government institutions. If the extract is connected to ventilating duct which is the general for residents of multifamily house, it will not be able to be cleaned enough, again and again incorporating the polluted air.

2. Getting extract and spare parts to it, consider that the air duct should not be too long and curved and have diameter corresponding to the section of ventilating duct of the apartment. Measure cooking surface. Pick up such umbrella of extract which width will not be less. It will allow to delete couples much more effectively. Install the separate electrical outlet for extract, having laid wires in cable channel.

3. Take tape measure and postpone cooking surface of not less than 0.7 m up. If you have gas-fire, then lay off not less than 0.8 m. Give mark and by means of the construction level "beat off horizontal". Having measured distance between fastenings on extract, transfer it to wall over plate. Make tags horizontal line.

4. By means of the perforator or drill make in noted points openings for dowels. Kill them with the hammer and by means of bolts fix on support wall. Establish on them extract and correct its situation, tightening or weakening bolts. The extract has to be located strictly horizontally.

5. Connect air duct to ventilating duct. If the opening of the air shaft is located far from extract, lay additional box, having hidden them over kitchen hinged lockers. Execute joints of boxes hermetically. In the conclusion of work establish casing and, having adjusted it on height, fix. Include extract in the socket, for performing trial start.

Author: «MirrorInfo» Dream Team