How to change the begun to rot log

How to change the begun to rot log

Wooden houses from logs are capable to stay long enough. Over time logs can begin to start to rot. If there is a lot of logs struck with rotting, it is worth thinking of major repair, and it is possible, and construction of the new house. But if rotting is noticed on one log, it is possible to get accurately it and to replace with another, undamaged.

It is required to you

  • - drill;
  • - jack;
  • - tape measure;
  • - hammer;
  • - hacksaw.

Instruction

1. Begin to perform work, having examined outer end of log. To remove it, use drill with suitable for performance has spent on drink drills. Execute the first has spent on drink about the termination of the log located below. So you will be able to separate end part.

2. Make the second has spent on drink – it should be executed on the internal wall of groove at marginal beam. For removal of the first cut part previously it is necessary to take care of that the empty space would be filled. Another words, it is necessary to record the provision of other logs that they remained the same as was, have not taken out the damaged log yet. In this case the jack is recognized as the most convenient option. With its help lift log which is located above, on centimeter - one and a half – the jack will reliably hold it, replacement will not be made yet. The turned-out backlash allows to pull out quietly part of log, and then to replace it with other product which in form and the size completely corresponds to the withdrawn piece.

3. Do not forget to execute sample of groove in new wooden element, having calculated their depth – it has to be in full accordance with overlying log. Bring the piece prepared for replacement into full accord with the fact that was before – it will allow it to rise into place more densely.

4. Having prepared element for replacement, lay roofing material on all length of socle in that place where there was begun to rot log. Process design anti-septic tank outside and from within. To exclude drafts, execute caulking iron with use of tow or close up all slots and joints by means of polypropylene. Unite blocks – for this purpose take long boards with a section of 50Х100 mm, beat two such outside, and three – from subfloor. Carry out additional treatment of boards with use of protective structure to exclude material damage. The substituting design as a result of such manipulations "will grow stout" a little.

Author: «MirrorInfo» Dream Team