How to construct bathroom in the house

How to construct bathroom in the house

Arrangement of houses, cottages and seasonal dachas do not take place without participation of construction of such necessary room as - bathroom. According to professional builders, the bathroom equipment for the house under construction does not represent complexity since the issue of discrepancy of its binding to sewer strut is easily resolved. But anyway, the organization of full-fledged bathroom in the house, demands attentive approach and accounting of all features of your room.

It is required to you

  • - set of construction accessories
  • - concrete rings for cesspool
  • - plaster
  • - sheets of moisture resistant gypsum cardboard
  • - plumbing

Instruction

1. Begin construction of bathroom with cesspool construction. The cesspool is mounted by means of ready concrete rings, but, behind their absence, it is simple to equip it with brick or concrete. Usually standard depth of cesspool is 1.5 - 2 meters. For convenience of its cleaning, the hole has to be located under bias. Then the inside face of hole is plastered, for ensuring its bigger tightness. Usually the cesspool is covered two-layer which lower part is made of tree, top – from metal.

2. Start laying of sewage pipe which usually is located under small bias to cesspool. The sewage pipe is brought to the house by strobleniye of grooves in walls or in floor. After the correct pipe laying and water supply system, such stroba on walls are leveled by plaster, and on floor are closed by means of cement screed.

3. Cover with finishing materials inside of the room intended for bathroom. Such materials are selected depending on flavoring preferences of the owner of the house, can be them: both ceramic tile, and plastic panels. If you have wooden house inclined to shrinkage, then in bathroom it is necessary to equip the sliding framework from metal section. Such framework fastens to wall which separates the house from the street. For its fastening the cord which stretches at the top of and in the bottom of wall is used. Then, on all width of wall, it is necessary to establish the sheet of gypsum cardboard and to fix it on three profiles. Remember that openings in profile, at its fastening to wall, have to be a little extended up, considering that distance which is assumed by shrinkage.

4. Install ventilation system for which mounting use asbestos-cement and clay pipes. Then start installation of false ceiling, having noted on perimeter horizontal line at that level where it will be fixed. It is necessary to consider that the bathroom is room with the increased humidity therefore it is necessary to apply sheets of moisture resistant gypsum cardboard to the equipment of false ceiling. By means of installation of false ceiling, it is possible to hide accurately previously installed ventilation system and electrical wiring.

5. Attach plumbing which type and form, corresponds to your design wishes to floor. Then establish heating appliances, lamps and other accessories.

Author: «MirrorInfo» Dream Team