How to construct panel board lodge

How to construct panel board lodge

The technology of construction of the house from boards has arisen in North America in the 20th century and has gained popularity thanks to the speed and simplicity of performance. The panel board house is under construction in optimum terms, but at the same time it is strong and durable. It is fine option for construction of country house.

It is required to you

  • - Cement;
  • - sand;
  • - crushed stone;
  • - armature;
  • - hammer;
  • - nails;
  • - roofing felt;
  • - iron corners;
  • - boards;
  • - boards;
  • - wooden inserts;
  • - plumb;
  • - tape measure;
  • - drain board;
  • - socle board;
  • - platbands;
  • - bars;
  • - rafters;
  • - squares from galvanized iron;
  • - saw.

Instruction

1. Build to site base according to the project, cover it with waterproofing. Plan chalk on the base of the place of pad of boards of socle overlapping. Begin with laying of boards in living rooms, gradually moving to verandah. Check correctness of installation of boards by verification of overhang of boards for base borders with data of the project. Pay special attention to laying of boards. In living rooms put them filing, in uninhabited down – the filing serving as floor, up.

2. Before beginning joining of boards, check marks of the top panel board binding, at the same time it is necessary to keep boards in the horizontal plane. Trace that the design marking of boards of floor which has turned out at you coincided with design. Look what overhangs beyond the base have turned out.

3. Connect boards, being constantly verified with the project. Hammer nails into the bindings adjoining with each other. Work on assembly should be performed together. While one person hammers nail, another has to hold the axe and control the place where the nail will come to light. rally verandahs by means of connecting boards with which it is necessary to upholster binding from above.

4. On the established boards of floor lay boards about 0.8 m wide to go on them as on boards it is impossible to go. Boards of floor of verandah can be not protected as they also will be floor subsequently. In floor boards at face of the house build in wooden insert of 10 x 5 cm in size.

5. Begin wall construction of the house with angular board. Bring it to the place of mounting, put vertically and level, combining board edge with floor edge. By means of plumb check vertical position of installation. Fix board by temporary knee braces. At first beat them to floor boards, and then to the established board. Put the second board and connect to previous by means of iron corners. Thus mount all boards around.

6. Put intermediate wall boards in turn and strengthen. Make check of correctness of installation of all walls by means of plumb. Tape measure measure the house on tops of walls and compare the obtained data with design. It is necessary to avoid problems with mounting of garret overlapping. Beat drain and socle boards.

7. Assembly of garret overlapping needs also to be begun with flooring of boards on which it will be possible to move as it is impossible to step on these boards too. To wall binding garret boards you fix through wooden inserts of 10х5 cm in size. At the end of assembly beat platbands on joints. Under inhaling of future rafters beat bars which size of 5х5 cm.

8. At assembly of roof in pairs connect boards in two points: from below near support carry out connection by inhalings from the boards standing on edge in the fad – by means of pads. Two boards creating roof slope need to be held at an angle throughout the entire period of mounting. It is also necessary to execute installation of boards of the pediments closing garret overlapping in building faces.

9. Supply boards of pediments with squares from galvanized iron. Fix them on binding of boards of overlapping. Check vertical position of pediments of plumbs, and prop up them temporary knee braces to the same binding. On the one side of face of the house establish board inhaling. Put the right and left extreme boards of roof one party on pediment boards, fix another by inhaling from below. Drain and banding boards are beaten after assembly of roof in places of interface of boards of wall and pediment. Saw through part of furring for smoke pipe.

Author: «MirrorInfo» Dream Team