How to develop the site

How to develop the site

Development of personal plot should be begun with planning. On scaled paper or in one of the computer programs intended for architects draw the plan of the site and arrange on it what you want to see: house, subsidiary buildings, kitchen garden, garden, flower bed. Only be not fond and do not forget about scale, otherwise your plan will be impracticable.

It is required to you

  • - plan of the site;
  • - folding meter;
  • - saplings of fruit-trees;
  • - seedling of long-term flowers;
  • - seeds of annual flowers;
  • - seeds of vegetables;
  • - shovel;
  • - watering can.

Instruction

1. Begin development of the site with vykorchevka of unnecessary trees. Not all from them have to be removed, perhaps, without trees the site will become "naked" at once and it will cease to be pleasant to you. It is considered that foliferous trees give too much garbage, it is necessary to rake up every spring in big heaps leaves and to burn down them. On the other hand, fallen leaves can become good raw materials for compost heaps and subsequently – valuable fertilizer. One more council for occasion of trees: in pineswinter bark useful insects, whereas in fir-tree bark – harmful. It also should be considered when you make the final decision concerning vykorchevka.

2. Order deep plowing of the site while on it there are no landings and buildings. The tractor will make this work in several hours whereas the person armed with shovel needs months of hard physical work. If the cultivator just proboronovat the soil, you need to remove weeds manually. It is especially important to destroy all roots of perennial plants: goutweeds, nettles, sow-thistle and so forth. There are cultivators which not only plow the earth, but also crush and also mulch weeds. In this case handwork will not be required.

3. Define whether your soil needs lime application. There are very few garden cultures which are well growing on sour soils, the majority of vegetables and berries yields good harvests if pH of the site is close to neutral. Lime should be brought since fall, without combining with introduction of organic fertilizers.

4. Mark future beds. Ideally they have to go east from the West if there is no such opportunity, lay them from the North on the South. In the presence of slope of bed it is better to place across it. At high groundwater occurrance lift beds over site level, having made curb 25-35 cm high. Beds 0.5 m wide and 4 m long are considered as optimum. On heavy clay soils provide additional drainage system. It is also best of all to make it at stage of development of the site that is before plant trees and garden cultures.

Author: «MirrorInfo» Dream Team


Print