How to draw the base

How to draw the base

What does construction of the base begin with? Of course from marking. The exact and competent marking is necessary in order that all corners of the built house were equal. This service it is possible to order in the management architecture and constructions, but it is possible to make and independently.

  • Hank of construction fishing line, 30-meter tape measure, wooden stakes or reinforcing rods, sledge hammer for driving in of rods or stakes.

1. The marking of the base is the correct orientation of location of the stood house on the chosen site of the area. Length of external borders measure 0.4 m more than length of walls of future house if you are going to build the house of felling to stack logs on the center of the base. For the house from bar length of external borders leave the same, that is equal to house walls. But if for the future you have planned finishing of walls by siding or brick facing, then measure length of borders only size bricks more with heater or siding and guides for it. Further it is necessary to hammer 4 reinforcing rod or peg, having designated perimeter of your base.

2. Define the first corner and hammer the first rod in this place. Take tape measure and measure necessary distance to the second corner, hammer the second rod. Further in the same way measure and hammer other two rods

3. When rods or stakes are hammered, do not hurry to pull fishing line. First of all it is necessary to verify length of the turned-out diagonals. If they are not equal, means marking it is necessary to correct because at you not the square and not rectangle will turn out, and it is rather rhombus. For this purpose move one party of marking (two rods at once), you will not achieve absolutely exact coincidence of diagonals yet. And also check corners on Pythagorean theorem. Measure on this side of the base 4 meters, and on another 3. Having connected these points, you have to receive 5 meters. It means that the corner has turned out direct 90 degrees, quite so and it is necessary. In the same way check all four corners.

4. When you have made sure that diagonals have coincided, pull fishing line. Now you can start marking of internal borders. Its parameters depend on how you have planned the future house. Mistakes and miscalculations at marking can lead to partial or even total destruction of structure of the house or problems at operation.

Author: «MirrorInfo» Dream Team