How to flood the monolithic base

How to flood the monolithic base

The monolithic base is divided into versions: plate and tape. The tape type in turn is divided into melkozaglublenny and buried. Filling of the base is completion phase which follows after installation of timbering, strengthening of walls and fixing of prefabricated reinforcement cage.

It is required to you

  • wooden trench, mixer, concrete

Instruction

1. Previously build several trenches thanks to which mix of concrete will be evenly distributed on all area from boards. Otherwise more liquid solution will spread at the edges, and dense mix with stony impurity will remain directly in the place of filling. Delivery of ready solution for filling is carried out in special mixers. It allows mix of concrete not to stiffen. As a rule, average volume is 6-8 cubic meters.

2. Also it is possible to flood the monolithic base by means of the special concrete pump which design allows to give concrete mix on distance to 50 m. But this method is more expensive therefore it is used in case of construction of big buildings.

3. The most economic way is the preparation of concrete directly on construction site without attraction of large number of experts. As a rule, in this case various concrete mixers for household application are used. The prepared concrete solution from cement, sand, crushed stone is filled in in timbering and at the same time condensed.

4. After filling of the monolithic base cover surface with polyethylene or roofing material to prevent from influence of external factors. For more uniform drying water several times during the day. In month after filling it is possible to begin construction of the building as ensuring durability requires full drying of solution.