How to hide gas boiler in kitchen

How to hide gas boiler in kitchen

Today use of hinged gas boilers is very popular. This heating equipment granting gentle heat in cold season differs in the compact sizes therefore it is established, as a rule, on wall in kitchen.

It is required to you

  • - hinged gas boiler;
  • - tape measure;
  • - pencil;
  • - paper;
  • - CD and UD profile;
  • - dowels;
  • - drill with drill;
  • - screw driver;
  • - self-tapping screws;
  • - special solution from ignition;
  • - gypsum cardboard;
  • - construction knife;
  • - openwork door.

Instruction

1. Think over in advance what you wish to make design registration of kitchen, and imagine it mentally. Analyze whether the hinged boiler will be in harmony with interior if just to leave it to hang on wall. Modern wall boilers are pretty beautifully issued (they can be white or brilliant) therefore harmoniously fit into interior.

2. If, in your opinion to opinion, the hinged boiler is allocated nevertheless on the general background, strongly being evident, hide it for doors of kitchen locker. For this purpose it is necessary to make cabinet by its sizes. For a start measure the sizes of hinged boiler and transfer them to paper (on each party give allowance of 50 mm), having created some kind of pattern. In sides recede from boiler 50 millimeters and draw the lines parallel to side edges of the heating equipment hanging on wall on the wall. Repeat the similar procedure, having receded from gas boiler 50 millimeters up and down and having drawn lines on wall. As a result the marking of future locker has turned out.

3. On the contour drawn on wall attach the CD profile which is in advance cut by the boiler sizes taking into account allowance, fixing it on dowels. Then using the UD profiles and self-tapping screws, collect framework of future hinged kitchen locker.

4. On earlier made pattern cut sheets of gypsum cardboard and process them special substance which prevents ignition. After gypsum plasterboards dry out, execute their mounting.

5. Putty gypsum cardboard, and later paint and let's dry. Establish openwork door. The locker for gas boiler is ready.

Author: «MirrorInfo» Dream Team


Print