How to issue the gas pipeline

How to issue the gas pipeline

You have made the decision to the house to bring gas. To fulfill this wish and to become the user of services of the supplier of gas, it is necessary to execute number of steps. With the advent of access to the gas pipeline in your house it will become warm and cozy.

It is required to you

  • - copy of technical data sheet of the house
  • - certificate on the property right to the house and parcel
  • - identity document of the owner of the house
  • - written permission from heads of architectural and planning management

Instruction

1. Find out who the owner of the gas pipeline. Agree with the representative this company about meeting to define whether it is possible to crash into the gas pipeline. Write the application for receiving conditions on gasification.

2. Having received affirmative answer from the owner of the gas pipeline, go to the design organization. It will become the developer and the manufacturer of the project for connection to certain gas pipeline of your house. Check availability of the license for implementation of works.

3. Agree on that point on which departure of the design engineer is made for performing all necessary measurements in the contract. In the same place discuss where gas devices what heating equipment of the brand it is better to install will be placed. The designer in turn will have to coordinate all parts of the project with technical department of gas company.

4. Make the estimate of all works, being guided by the project documentation and having made all calculations. Issue the contract for carrying out technical supervision. Receive the certificate of conformity on the gas equipment, permission to its operation. Receive the act of inspection of flues by fire inspectorate and provide it.

5. After signing of necessary documents and establishing all affairs with the company owner and design department, go to the organization which will perform all building and construction works. Check the license at this company, make sure that it is included into the register of the company owner of the gas pipeline.

6. Having coordinated the cost and work completion times, sign the contract with assemblers. It is necessary in order that you had certain warranties from installation contractor.

7. After implementation of mounting of the gas pipeline and all equipment trace that technical documentation has been made. Then you, the contractor and the representative of gas company, having formed together the commission on acceptance, have to accept the gas pipeline.

8. In lack of complaints and remarks, receive the receipt of technical supervision from the representative of gas company. Pay and transfer its copy to installation contractor. Notice that on the date of acceptance all equipment has to be connected.

9. Within 21 days the gasometer will be sealed then you sign the contract for supply of gas and service of the gas equipment. Surely undergo instructing in rules of safe use of gas. It can be done and to undersign for gas company after the instructing which is carried out by the expert.