How to lay floor plywood

One of eco-friendly and enough durable floor coverings plywood is considered. It can form the good basis for finishing layer, at the same time it will create additional warm and sound insulation. To lay floor plywood correctly, it is necessary to execute the following sequence of actions.

It is required to you

  • — veneer sheets;
  • — primer of deep penetration;
  • — garden film or aero gel heater;
  • — electrofret saw or hacksaw;
  • — bar of 20×20 mm;
  • — the self-leveling mix;
  • — mixer, trowel, mop, shovel.

Instruction

1. If at you it is filled already in and concrete floor is operated, take tape measure and lay off the distance equal to veneer sheet width from distant wall. It will be the line of joint. Note it on floor.

2. Take chisel and the hammer and beat out trench, width and 20 mm in depth. Lay in it bar. Cover floor with primer.

3. Dissolve the self-leveling mix and fill in with it floor. Involve it in basin the mixer or drill, and pour out on all surface too much, level mop. Let's mix dry not less than a week. Check extent of drying of floor. For this purpose put piece of zakamenely salt. If in hour salt does not collapse, so floor has dried.

4. Lay it film or aero gel heater. At podstilaniye of substrate do not leave admissions and big overlaps, especially if you use heater. Stack aero gel layer foil to concrete bed.

5. Lay integral veneer sheets and beat them to bar in tie. If you have correctly calculated the position of bar, then with strengthening of plywood on gender of you there will be no problems. For nailing down use nails of 20-25 mm and the hammer. The distance between nails has to be no more than 5 cm. That nails did not get out of plywood, previously wet them in strong hydrochloric solution for the night.

6. Measure exact distance from wall to edge of joint of the attached leaf and by means of the electrofret saw cut out leaf of the required size from integral piece of plywood. Attach it nails to floor the same way.

7. Drill opening electric drill for fastening of plinth and fix it on room perimeter near each wall. That the joint at plinths was not visible, do it with an overlap at an angle 45º.

8. Cover floor from plywood with protective paint or solution to ensure its safety for many years. For ensuring good aeration of the room in the course of drying of paint and prevention of access to animals and birds, close windows and doors mosquito grid.