How to make mounting of the conditioner with own hands

How to make mounting of the conditioner with own hands

Trouble-free operation of the conditioner and comfortable climate in rooms depend not only on quality and power chosen Split system but also on its correct installation. Having decided to do mounting of the conditioner by the hands, it is necessary to resolve issue of the choice of the optimum place for placement of the internal and external block.

The Split system or the wrong selection of spare parts will lead discrepancy of specifications of mounting to fast breakage of the cooling device. Besides the overall performance of the equipment and expense of the electric power are in direct dependence on operating conditions.

For example, if near the conditioner there is heating device, the compressor will spend more energy and to thicket to fail. Therefore the issue of the choice of the place for installation of the conditioner in the apartment has to be resolved by one of the first.

Features of the choice of the place for mounting Split system

The design Split system consists at least of two blocks, and it is necessary to choose the place for both. At the same time it is necessary to consider how in rooms cold air spreads and also it is necessary to take into account specifications to placement of the conditioner.

The body of the external block needs to be installed so that it did not block view from the window to neighbors, and condensate should not flow down on the house wall. However it is necessary to fix the block within reach from window or from balcony as this equipment periodically needs service.

Best of all to install the external block from North or East side, it is desirable in the lower part of window. It has to be located below, than internal, and whenever possible in the most cool place of facade of the house, in shadow from overhang of roof, hood or walls.

If mounting of the conditioner the hands is planned in owner-occupied dwelling, the place is chosen usually, proceeding from bearing capacity of walls. In the presence of the ventilated facade of the house it is possible to use special fastening or to hang the external block on socle.

Specifications at the choice of location of the internal block:

  • from the block to ceiling there have to be not less than 15 cm (at models of some producers not less than 20-30 cm);
  • to wall sideways — not less than 30 cm;
  • to any obstacle against which the stream of cold air — not less than 150 cm will break.

The maximum distance between internal and external blocks usually makes 6 meters if the producer has not specified other data. Observance of all conditions the Split system will ensure trouble-free operation.

Tools for mounting of the conditioner the hands

For independent installation of the conditioner prepare all tools in advance. It is required to you:

  • vacuum and bicycle pumps;
  • tester for wiring;
  • indicator;
  • the pipe cutter for cutting of copper pipes;
  • manometer;
  • perforator;
  • drill with set of drills of different diameter;
  • razvaltsovshchik for copper pipes;
  • rimmer for removal hangnail.

If there is no Rimera, it is possible to manage file / natfilem and abrasive paper.

Materials for mounting of the conditioner the hands

The following consumables will be necessary for installation of two blocks Split system:

  • Cable for connection of blocks among themselves and power connections. Usually the 4-hzhilny cable with section 2-2.5 of sq. mm is required. Cable length corresponds to route length with small stock.
  • Copper thick seamless pipes especially for conditioning systems from the ends zavaltsovanny industrially. Pipes will be required large and smaller diameter. Take the whole bay and check for scratches, dents and other defects. Diameters are specified in the instruction to Split system.
  • Heater for pipes from technical rubber. The required length is equal to route length. Heater is necessary on pipes of both big, and smaller diameter.
  • Drainage tube. Experts recommend special corrugated hose with plastic spiral inside, but it can be replaced with polypropylene pipe. Length of tube corresponds to length of the route plus 80 cm.
  • Two L-shaped brackets for installation of the external block. Their size has to correspond to block dimensions, and bearing capacity – to exceed its weight by 4-5 times. Such stock is required for compensation of snow and wind loads.
  • The bolts, anchor, dowel corresponding to type of brackets and assembly plate for the internal block and also to type of walls on which it is necessary to install the conditioner.
  • Plastic box of 60*80 cm that it was possible to close the carried-out communications.

Step-by-step mounting instruction of the conditioner the hands

After preparation of all materials and tools by the first install the external block, then the system indoors is mounted. In the course of installation it is necessary to observe strictly safety measures and it is correct to use safety belts, especially if to work from the outside streets it is come above the first floor.

It is the best of all to install the conditioner during major repair as it is necessary to punch wall, to arrange stroba and to damage finishing.

Installation of the external block Split system

At first on the chosen place by means of level mark places for fastening of brackets, then drill in opening wall under anchor bolts. To carry out interblock communications, drill the perforator in wall through hole with a diameter of 80 mm. If house wall brick, it is desirable to get on seam between bricks, so the opening will turn out accurater and process will go quicker.

Establish brackets on marking, check alignment on level and reliably twirl bolts. The external block on brackets needs to be fixed so that between radiator and wall surface there was space not less than 10 cm.

If the block is reliably fixed on external wall of the house, pass to the next stage. Connection to network of power supply and closing up of the formed gaps carry out a bit later.

Mounting of the internal block of the conditioner

The internal block should not appear behind curtains, over the battery and indoors where there are sources of electrohindrances. They can be the cause of breakage of the block processor. Having decided on installation site, surely check wall for lack of any laid communications:

  • electric wiring,
  • water pipes,
  • heating system.

If the site is free, start mounting. At first fix assembly plate. For this purpose from ceiling recede 10 cm, from wall corner – 5 cm and mark with pencil horizontal line. In it drill openings under fixtures and reliably fasten plate.

On plate install the internal block of the conditioner, then in side wall drill opening for communication connection – pipes, electrical wiring, hoses for removal of condensate.

Connection of electrical wiring of the conditioner

Lay wiring for the internal block indoors, the minimum section of cable has to be 1.5 sq. mm. Surely to power supply install the separate automatic machine of shutdown. Connect wiring to guard on input: connect yellow wire with green strip to zero conductor. For determination of zero and phase in guard use the indicator.

Connect terminals of both blocks the isolated multicore wires, passing them through the opening drilled in wall. You watch that names of terminals coincided with wires. All scheme of connection is in detail painted in the instruction to your model Split system.

Laying of communications Split system

Cut copper tubes, leaving stock on bends about a meter. For flexure of tubes use special purpose tools to avoid formation of dents, wrinkles and cracking of metal. Put on thermal insulation the prepared tubes – polyurethane foam hoses.

Put on threaded flanges the warmed pipes so that the thread was located at the end of tube. At the next stage carry out flaring of tubes. Do flaring very accurately that on tubes there were no grooves and cracks. The nut at the same time has to be put on easily rolling, and it is better to carry out inhaling torque wrench to exclude extrusion of the beaded connections from nut.

In turn attach pipelines to the corresponding unions, it is difficult to mix them because of different diameters. On unions twirl flanges that the contact was hard, but not squeezed, otherwise you can damage tube. In conclusion connect piece of plastic tube with the reinforced body to branch pipe of drain. Execute fixing piece of the thermoseated tube or threaded flange if it is available in set. Drainage tube as it is possible take away from load bearing wall further.

After these operations bring pipes to opening, level, from outer end record densely to wall collars. Nearby attach wiring cable, connect the pipeline to the external block of the conditioner. Close opening polyurethane foam or silicone. Check all external connections for tightness by means of the bicycle pump and soap solution. If somewhere passes air, tighten thread more densely.

How to execute pumping out of system

Pumping out of system will allow to remove the smallest parts of dust and moisture. This process after sealing of threaded connections is carried out, otherwise it will not turn out to extort air completely. For this purpose the vacuum pump is connected to system and within hour pump out air.

Filling with coolant and testing of the installed conditioner

Pump in system coolant from cylinder. For this purpose connect the adapter and the manometer to cylinder, fill the tank, strictly watching pressure. After completion of process turn on the automatic machine disconnector on the conditioner, the Split system independently will leave in the test mode. If everything functions without failures, cold air evenly arrives, close opening in wall and remove mounting consequences.