How to put the bathing furnace

How to put the bathing furnace

Bath – the great place not only to relax, take a steam bath and derive pleasure from bathing, but also good means for restoration and strengthening of health. Earlier each villager in the yard had the sweating room. Today this tradition is restored and many at dachas build the special buildings equipped under bath. But many questions are raised by not bath, but process of construction of the bathing furnace. It is the most important part on which warming up the amount of steam and its beneficial effect on organism will depend.

It is required to you

  • - sand;
  • - clay;
  • - water;
  • - oven brick;
  • - doors;
  • - asboshnur;
  • - valve;
  • - grid iron;
  • - tank for water;
  • - smoke pipe.

Instruction

1. First of all, prepare glinopeschany solution. The quality of future furnace will depend on it in many respects. For this purpose mix sand, clay and water in proportions 1:1:4.

2. Start laying of the bathing furnace. But at first spread each row without solution to pick up the bricks identical on height and length, thereby having provided seams of uniform thickness.

3. Gain necessary amount of solution on trowel and lay out to the place of bricklaying. Carefully level it. Lower the prepared brick in water for 20 seconds, and then lay on solution.

4. Easily tapping with trowel, seat brick to seam thickness in 5 mm. Carefully pick up unnecessary solution.

5. Stack the following brick with adjunction spike to previous. After laying of row surely check level its horizontal position.

6. Along with brickwork establish doors and grid iron. Attach furnace and podduvalny doors soft wire to laying, put the ends of wire in seams.

7. On perimeter impose door asboshnury and put on solution layer. At installation of tank for water do not forget to impose it with glinoasbestovy mix which at expansion will not allow the oven to crack.

8. Lay the last metal smoke pipe which goes through roof and ceiling of bath.

9. It is necessary to dry the constructed bathing furnace 2-3 days before it is ready to the first protaplivaniye.

Author: «MirrorInfo» Dream Team


Print