How to put wall tile

How to put wall tile

The wide choice of various materials and tools considerably simplify laying of wall tile. For wall decoration use ceramic tile of the large size to avoid big quantity of seams on surface.

It is required to you

  • - tile;
  • - glue;
  • - toothed palette;
  • - level;
  • - plitkorez;
  • - direct board;
  • - pencil;
  • - finish;
  • - rubber palette;
  • - lacing;
  • - sponge;
  • - water.

Instruction

1. Prepare the basis under tile. For this purpose take direct board and attach it self-tapping screws strictly across in that place where there will be first row.

2. If you are going to put tile on perimeter of all room, then attach levels on surface of walls at the same level, as the first. That the tile laid down exactly, check all guides construction level.

3. Being going to begin laying with floor, check its surface level. If it not equal, then put level on floor. Level it, enclosing under it levels of the necessary thickness.

4. Attentively examine walls precisely to plan laying in the locations of the socket and switch. The less it is necessary to cut tile, the better.

5. Dissolve special glue in necessary quantity. Do not forget that it quickly hardens. Begin to put tile from the right corner. Attach special corner from which begin to stack. It will allow to smooth shortcomings if the edge of tile is chopped off.

6. Take the toothed palette. Evenly apply glue on tile. Paste it to wall. Consistently lay out the first row on slide guide.

7. Between tiles insert special crosses for gaps. In laying there should not be differences. For check take one more tile and apply it to gap. It has to lie exactly and densely on both tiles. Otherwise, level the second tile on the first, having lowered or having added glue.

8. At the end of wall you should cut tile. Use special plitkorez. Plan for surfaces pencil cut edge. Further press on it level. Use drill to drill holes in tile under wires.

9. Hide the first row of laying in special corner. Consistently lay out tiles one after another down. Insert between them crosses for gaps. Check uniformity of laying, putting construction level to all row.

10. After full drying-out of laying remove slide guides. Remove all crosses. Start finish of seams.

11. Take finish under color of tile. Part it with water to homogeneous mass. The rubber palette rub in seams.

12. Wipe with damp sponge of surface of tiles. Smooth Zatirochny seams with lacing. The finish will be pressed and will be leveled.

Author: «MirrorInfo» Dream Team


Print