Interior finish of owner-occupied dwelling

Interior finish of owner-occupied dwelling

Constructing the house or in case of its ready acquisition, each owner of the real estate tries owing to the desires and opportunities to deal with issue of interior finish of the dwelling.

The works connected with arrangement of interior finish of the room, whether it be new house or already earlier manned include preparatory stage, draft finishing, then fair registration and performance of touch-ups. If the building is bought already ready to settling, then the interior finish of such owner-occupied dwelling begins, usually, with dismantling works which include removal of old plaster, old decorative designs, wiring, doors, lighting equipment, floor covering, batteries. In case finishing of again built building is carried out, this stage is not carried out.

Re-planning of internal space

In need of re-planning, partitions are established, that is it is possible to carry out change of internal configuration of rooms. Partitions and walls become covered with finishing materials.

If not the stretch ceiling, but any other, for example, executed from boards is mounted, then it should be processed in addition previously, that is boards to level and varnish.

Heating pipes and external electrical wiring are closed by the boxes issued by the same material which is used for finishing of walls. If there is need, then windowsills change completely. Walls are puttied, grounded, leveled. Further the ceiling is mounted and the plinth is established. In walls, in sheathing material openings for installation of ventilation and sockets become. And the surface of walls can be papered or painted. Openings are closed by means of hatches and decorative grids.

Replacement of window and door units, installation of floor covering

Window and door openings trim with panel or plastic boards. Door assemblies are established and, if necessary, old windows change.

In case of the need and desire to sheathe the room plastic panels, then it is necessary to execute accurate furring that then to beat or fasten plastic panels to it.

After that it is necessary to mount lighting devices - chandelier or lamps in walls and ceiling. As floors the parquet or other suitable floor covering keeps within. If final finishing of floor is provided, then it is necessary to carry out a number of the additional works concerning surface preparation. Then installation of plinths follows.

Author: «MirrorInfo» Dream Team


Print