Quartz primer for walls: 5 stages of causing structure

Quartz primer for walls: 5 stages of causing structure

For improvement of adhesion of wall surface with finishing material the intermediate structure is used. It is primer which main component is quartz sand. The water and disperse structure does it tamperproof, quick-drying. Quartz primer improves properties of surface, levels it.

Quartz primer will help to provide ideal interior or exterior finish of walls from concrete and other materials. These products with good adhesive properties are selected on structure, are applied on surface in several stages. The right choice and observance of stages of technological process are very important. 

Types of compositions of primer with quartz sand

In work of the master use one of three types of adhesive material. Structures on the basis of synthetic pitches and quartz sand treat to the first group. They differ:

  • safety due to lack of solvents and other harmful components;
  • the possibility of application for decorative finishing — allows addition of coloring pigment;
  • universality of application in and outside of buildings;
  • minimum flow — on 1 sq.m no more than 300 g of material are necessary.

Quartz primers on the basis of pitches of synthetic origin can be applied on surface at temperature not below +5os. The more warmly, the structure dries quicker. The average time of hardening — 5 hours. This material often call soil-paint, but it is not suitable for finishing covering. 

The following option includes acrylic resins and latex. Such quartz primer perfectly transfers temperature variation and humidity, has high vapor permeability and water-repellent properties. On expense this type of adhesive structure does not differ from previous at all. Only the primer price with acrylic resins is much lower. 

The third category — silicate primer with quartz. The base from liquid glass allows to fill ideally all cracks, to correct defects, roughnesses on surface of walls. Soil is easily combined with different coloring pigments for expansion of the sphere of the operation. This option of structure excellently is suitable for work in rooms with the increased humidity level. Silicate primer is often used for work in basements. It is recommended to apply primer on wall at temperature above +7os. The structure on silicone basis has two serious shortcomings — the long period of drying of 12 o'clock and the highest cost in the market. Therefore repair and finishing crews often choose other options of primer. 

Preparation of the tool and stages of drawing

The special roller or brush-maklovitsa — the main working tool. For processing small on the area, but remote sites it is possible to take small narrow brushes. For mixing of structure it is recommended to use drill and safety glasses to avoid hit of primer in eyes. The chilled surfaces cannot be processed at once — they have to thaw completely for obtaining optimum result. To make everything it is correct, it is necessary to adhere to the correct sequence of actions. All work is divided into five main stages:

  • careful cleaning of surface (basis);
  • removal of old covering;
  • primer preparation;
  • direct drawing by the roller or brush;
  • finishing finishing of walls.

At the first stage all types of pollution are eliminated. Sometimes the surface is washed with water. For further preparation of walls it is possible to use damp rag, the vacuum cleaner. The old covering is usually removed rigid metal brush. Further there is training of structure — soil is stirred by drill with the mixer before full connection of components with each other. It is desirable to repeat the procedure each 20 minutes as the dissolved particles of quartz will settle.  

After receiving stiff consistency of material it is possible to start the main works. Quartz primer pretty fast, especially is applied if at it there is coloring pigment. These actions do not require professionalism — with qualitative structure and the suitable tool everything will turn out perfectly. Usually drawing several interlayers of adhesive material is not required. After processing of walls it is recommended to wait not less day. Then it will be possible to start further front finishing. 

Nuances and councils

Primer with quartz sand in structure optimum is suitable for the subsequent work with limy, plaster, cement plasters, wood and ceramic surfaces to which roughens for faultless adhesion. This material is not recommended to be applied by means of the spray though inexperienced repairmen use this option for simplification and acceleration of work. Aerosol will not allow to achieve the necessary level of surface roughness of walls, and here the nozzle can get littered. If you see that the plaster coat exceeds 5 cm, use tape-serpyanku 

Some experts are sure that there will be not enough simple cleaning of surface and advise to carry out thorough degreasing of walls to putting primer and further finishing. When choosing structure it is recommended to be guided by the level of expense and decorative properties of product. Quartz primer will not be suitable for processing of plastic and metal surfaces as they have no ability of absorption of liquid. After drying, sand quickly will appear on floor. It is not recommended to use this material for processing of walls which are exposed to strong influence of ultraviolet rays. The sun harmful influences quartz and priming mixes. They will not be suitable and for processing of ceilings.

Experts consider that it is the most reasonable to use quartz primer if it is necessary to get rid of minor defects, to cut consumption on finishing finishing, to create half transparent surface. Use of this material opens unlimited opportunities for dressing of facades of buildings inside and outside. But during operating time out of the room it is worth being afraid of atmospheric precipitation. The rain drops falling on walls can spoil all work. Therefore it is better to postpone it until increase in dryness of air. At observance of all rules, primer and the subsequent plaster will long float. 

  

Author: «MirrorInfo» Dream Team


Print