What to fill in floor in the bathroom under tile with

What to fill in floor in the bathroom under tile with

To equip in the bathroom floor – one of the most difficult operations at repair. The specifics of the room complicate task – the increased humidity forces to use only special finishing materials.

To make good floor in the bathroom, it is necessary to approach performance of work as it is possible more accurately. Filling of floor under tile will demand not only thorough approach to repair, but also right choice of materials. Otherwise floor quickly needs alteration, and need to carry out dismantling of covering and repeatedly will be pleasant to finish floors hardly to someone - it is not only additional inconveniences, but also financial expenses.

Why to arrange tie on floor in the bathroom

Application of tile for floor construction in the bathroom is considered the most practical. Laying of tile much more conveniently and quicker manages to be carried out on plain surface. To level surface of half of the bathroom, on it the tie is arranged. Such approach helps the tiler to spend less time for putting tiled glue, the batch can be made in the minimum quantity, and the tile gives in to control during laying easier.

Before carrying out tie, half of the bathroom needs to be cleaned and waterproofed. For creation of moisture barrier material should be chosen as follows: if it is going to carry out processing of both floor, and walls, the backing waterproofing will approach. For protection of only one floor it is better to buy coating material. For obtaining high level of coupling of moisture barrier and floor the last should be processed before works as primer.

Alignment of floor by means of tie

For alignment of floor in the bathroom it is better to use the construction mixes intended especially for this purpose. Non-shrinking cement is the cornerstone of such mixes. Terms of drying of such tie, so, and creation of finishing covering, depend on grade of the leveling mix. The first few days it is necessary as it is possible to observe more attentively the mode which is recommended by the producer – this information has to be on packing. As an alternative sand-cement structure the self-leveled mix can be chosen. But if floor very uneven or possesses essential shortcomings, such mix will not approach. It can be applied only to the second leveling layer. For example, if in the bathroom it is going to install the "heat-insulated floor" system, such option will approach as well as possible. When the first layer of cement and sand tie dries, on it the thermal insulation layer from above keeps within then the second layer is filled in. The floor surface has to be newly leveled after that. After that bulk floor is ready to arrangement of floor covering.

Author: «MirrorInfo» Dream Team


Print