That later repair to receive ideally equal walls and a ceiling, it is necessary to perform preparatory work which includes putting plaster on walls. It is important to know how it is correct to plaster as, despite simplicity of works, they have the nuances which are important for considering.

How it is correct to plaster a ceiling?

If there is desire to save and confidence in the forces, then it is possible to run finishing works the hands.

As it is necessary to plaster:

  1. Alignment of a surface. At first it is necessary to remove old plaster, and then, to wash away stains.
  2. Carry out a ceiling marking that considerably will simplify work.
  3. After that cover a ceiling with primer which is necessary in order that subsequently plaster was correctly linked.
  4. It is possible to get to the main work only when the ceiling completely dries out. Make small poles to fix a grid by means of glue. Using the pallet, apply plaster on a ceiling and carefully level it. If to roughness serious, then put several plaster coats.
  5. That over time cracks did not appear, then cover a surface with a thin layer of hard putty.
  6. Everything will need only to be ground and once again to apply primer.

If interests as it is correct to plaster gypsum cardboard on a ceiling, then process considerably becomes simpler. It is necessary to apply at first primer, and then, to proshtukaturit a surface. The completing works same most, as in the option described above.

How it is correct to plaster the base?

In case not to protect an elevated part of the base from mechanical and atmospheric actions, then through some time it can begin to collapse. For work it is possible to use cement mortar and also special mixes for plaster. It is worth beginning with preparation to remove the showering sites, ledges and various defects. Generally, it is necessary to remove everything that badly keeps. You will surely mark everything a rigid brush to remove all dirt and splinters.

As it is correct to plaster walls and the base cement mortar or hard putty:

  1. At first wet all masonry seams and cracks, and then, process them solution.
  2. Attach the reinforcing grid, using brackets or dowels which have a wide hat.
  3. Using level, draw the flat line along the base, having receded from the most acting part on 2-4 cm. Hammer vertical pegs on this line, and then, between them and a socle shower gaps with solution, without forgetting to check everything level. When the turned-out hillocks dry, remove pegs. As a result beacons on which it is easy to equal plaster will turn out.
  4. Moisten a surface with water, apply liquid soil solution and when it grabs, it is possible to use working solution which has to be plastic.
  5. When plaster grabs, but will not dry, surely jam a surface.