Where to put the counter

Where to put the counter

Mounting of the electric counter can be conducted independently, following rules of installation of registration devices and electric equipment or to entrust the experts having the license for work on installation of electric equipment.

Independent dismantling and connection of the new metering device is strictly forbidden. To carry out installation of the new counter which you can choose at discretion and make replacement one-rate on the multitariff device, address to the power supplying company. Submit the application, specify model of the electric meter which you are going to install. Even if the instruction has been issued to you – it does not exempt you from coordination of installation of the new metering device. On the basis of the submitted application, passports will give you resolution to replacement and installation of the new electric counter. Then you can start direct dismantling of the old counter and mounting of the new device. If you are going to use services of the electrician, address to any organization having the license for carrying out works of this type and sign the contract for mounting. The professional master will execute everything in compliance specifications and rules of installation, and you will not need to care for rules of mounting of the electric counter. At independent installation of the device of electric accounting observe all instructions specified in rules of installation of metering devices and electric equipments. The device has to be installed in the readily available place at the height from 80 to 170 cm. Also consider that the counter it is necessary to have in the maximum proximity from input cable. Fix the counter on special wooden, plastic or metal guard which is on sale in specialized shops. The room where the electric meter is installed has to be heated, but is admissible to install devices in rooms with zero temperature in cold season or near the house in the special iron guards protecting the device from moisture and freezing. Input of the device to operation goes the final stage of installation. That you could use the new counter, call the expert from the power supplying company. To you will issue the act and will seal up the device then you are obliged to renew the contract and to use the installed counter directly.

Author: «MirrorInfo» Dream Team


Print