Construction of the pool

Construction of the pool

Almost each owner of country house dreams of the pool on the garden site. Today they have opportunity to build the pool of any size and form. And it can be done not only on the site, but also indoors.

Instruction

1. Pools are divided into assembly and stationary. Inflatable pools and those which mount on the special frameworks made of PVC can be combined pools. Such pools do not cost much, and they can be found practically in any specialized shop. As for stationary pools, they are established for long-term use, considering that the national teams are put for season. Stationary pools can have simple and difficult design. Simple call pools for which the ditch is dug out, strengthening and waterproofing is carried out. You can independently make such pool for couple of days. But such design is rather short-lived and often maintains only one season. Pools of difficult design have concrete basis on which not only the bowl separated by mosaic and tile but also complex system of pipelines on which water is pumped and removed from the pool is established.

2. The concrete basin begins to be built, first of all, from drawing up the project in which are specified location, the sizes and form of the expected pool, and also thickness of wall and bottom. On the basis of the ready project the works connected with preparation of foundation of the pool begin. It is the best of all to trust similar works to qualified specialists who have experience and knowledge in the field. Preparation of the basis means not only ejection of ditch, but also installation of sandy pillow which thickness has to equal 15 or 20 cm. Fix mortgage elements in ready ditch, in the form of ground draining, mortgage privotok, nozzle, skimmers, and also other necessary communications. Then all basis is filled in with concrete. Concrete has to dry out well, otherwise can form swellings or cracks. As soon as concrete dries out, it is necessary to begin to mount timbering. It is very important stage of construction of the pool. It is possible to make disposable timbering of tree or reusable of metal.

3. Now it is possible to start concreting of bottom, and also walls of future pool. All sides have to be equal, and the bottom has to be executed under small inclination that water was well drained. Concreting it can be carried out in two ways: continuous casting or casting in two calling. Continuous casting is applied more often because it is expedited and costs cheaper.

4. As soon as all concrete qualitatively stiffens, it is possible to begin to perform works on finishing and decor of the pool. For finishing usually use color tile and mosaic. Finishing stage of construction of the pool is the finish of intertiled seams by means of special epoxy zatirok.

5. So, all works are performed, and your pool is ready. Of course, everything passes in reality not so simply as it is described above therefore it is necessary to mark out enough time for construction of the pool. Otherwise, the new pool will not function properly.