Desire to live in the house arises at many people. Today modern construction of houses is conducted from the rounded or hewn log, glued bar, gas concrete, foam concrete, brick, keramzitobetonny blocks, quite often houses build on the Finnish technology – frame-board method. Houses from keramzitobetonny blocks differ in reliability and low cost.

1. Draw the plan of future house with accurate sizes. Without detailed project construction of the house from keramzitobetonny blocks of message is rather difficult, especially after construction of the base and construction of external walls.

2. Flood the base. It is known that construction of the house from keramzitobetonny blocks begins with the base device. If you want to have the basement in the house, then construction of the base will require concrete blocks. If is not present, then will be tape type of the base enough.

3. Let the base stand. It is necessary in order that there has taken place shrinkage of the base. The minimum time for shrinkage of the base – 3 months. Quite often walls from keramzitobetonny blocks begin to be put up at once after drying of the base. In this case it is necessary to wait that the house has completely shrunk before fine finish.

4. Put up walls with apertures for windows. It is better to entrust construction of walls to professionals in this area. They will bring walls out of keramzitobetonny blocks geometrically correct. Keramzitobetonny blocks differ in trueness to size and almost ideal form. At competent laying of wall from keramzitobetonny blocks turn out equal and do not demand great efforts for alignment.

5. Fill in foundation of the basement if it is available for you. Before construction of roof in the house it is necessary to provide air vents and flue. It will need to be constructed of red refractory brick. In the basement (or on the first floor if there is no basement) under exhaust pipe flue the strengthened basis is under construction.

6. Build partitions. If the house is two-storeyed, then some partitions will be required to be built first of all as they will perform functions of load bearing wall. Load-carrying structures always on thickness there are more normal partitions.

7. Design rafter system for roof. It has to be constructed ideally that the rooftop completely performed the functions. If to save means on rafter system, in the house the leak in the future can appear, or the roof should be blocked.

8. Choose heater and roof for roof. The most popular type of heater – mineral plates. For roof most often use metal tile, soft tile, ceramic tile.

9. Sheathe house walls from keramzitobetonny blocks from outer side siding with heater or impose with red facing brick. Putting decorative plaster can become alternative. The house will turn out warm.