How to construct bath at the dacha

How to construct bath at the dacha

It is so pleasant to finish the unlucky working day on the seasonal dacha visit of the Russian bath which cures body and soul. Traditionally the bath was built of the wood round timber. Now more often round timber is replaced with bar from which it is possible to build the building in short terms as it is possible to establish walls at once on the base, without preliminary drying.

It is required to you

  • - cement;
  • - sand;
  • - crushed stone;
  • - gravel;
  • - bar;
  • - brackets;
  • - pipe for draining;
  • - iron furnace;
  • - tes;
  • - roofing material;
  • - thermal insulation materials;
  • - paroizolyatsionny materials.

Instruction

1. Any construction begins with construction of the base. Under bath the continuous footing will approach. Before its installation make marking. The ditch can be dug by means of the tractor as you all the same should level edges and bottom manually.

2. After leveling pour out bottom sand-gravel mix, carefully stamp. You can flood the base with ready solution or prepare concrete mix independently. At any way of filling at first establish timbering from ready boards or from equal dry Teso. In timbering it is desirable to build in prefabricated reinforcement cage. If the soil in your area rather dense, it is possible to pour the base without the strengthening framework.

3. If you are going to flood the base with independently made concrete solution, observe proportions. Mix 1 part of cement, 3 parts of small crushed stone and 3 parts of sand. Pour in water gradually that the homogenous mixture which will easily pour out from the concrete mixer has turned out.

4. The base gains final fortress within 1 month. Only in 30 days on it it is possible to establish walls, but you can do three rows of the first floor at once as soon as have completed the works on filling and within three days is abundant have spilled the base that there were no cracks when drying.

5. Buy bar for walls dry, equal, qualitative. Attentively examine construction material if in bar there are bug wood borer courses, it is better to refuse purchase at once as the increased humidity will promote that the bug completely will destroy all bar within the first year.

6. Before installation of walls carefully waterproof the first floor that the lower wreaths were not subject to destruction. Process all bar anti-septic tank, dry within several days, impregnate the lower wreaths with lubricating oil, over it cause the structure interfering ignition. At faces make cuttings, at first mark cross and longitudinal pro-saws, then make them by means of saw. If you well own the axe, then it is better to cut down cuttings, do connections by means of brackets.

7. Establish roof. Single-pitch, double-pitch, granary roofs are suitable for bath. Do such most of which of all is pleasant to you according to the material resources.

8. Bring draining not less than to three meters from bath. Dig out drain hole, cement floor bottom in bath and remove outflow pipe with small bias towards drain hole, warm pipe by means of waterproofing and mineral wool.

9. Under the furnace flood the monolithic base. Modern iron furnaces of the Finnish, Italian production are easily mounted, it is possible to install them within several hours.

10. Inside sheathe bath yew from deciduous breeds of trees. Warm ceiling and external walls by means of paroizolyatsionny and thermal insulation materials.