How to establish jacuzzi

How to establish jacuzzi

If five-seven years ago the jacuzzi could be met only in saunas and country houses, then today these hydraulic engineering constructions have won the consumer market so that often they are installed in normal bathrooms.

1. The main task for the person interested to have jacuzzi in own apartment - to get permission to its installation in bodies of housing. Besides, sometimes for installation of such bathroom it is required to unite the room of the bathroom and toilet, i.e. there is need for re-planning of the apartment that too demands special permission.

2. And only after obtaining the relevant documents you will be able to be engaged in direct installation of jacuzzi. The truth it is not necessary to establish it to you. All more or less solid companies trading in the sanitary equipment have own masters for works of a such type.

3. Measure the room of the bathroom, draw its plan together with communications and electrodistributing, bring it in shop to masters, you vybrit bathtub and pay money.

4. Dismantle old bathtub, establish on pipes of hot and cold water of filta of mechanical cleaning. Without them your jacuzzi will not be established, most likely. Provide to masters access to elektoset of your apartment. Use of sockets near jacuzzi is inadmissible since the bathtub because of the humidity belongs to rooms with the aggressive atmosphere. Therefore installation of electric equipment is made for the hydromassage bathroom by direct connection to the equipment cable.

5. Wait for delivery of bathtub, arrival of masters. Trace mounting of jacuzzi. Usually hydromassage bathtubs establish strictly horizontally on level. For this purpose it has special legs with curving. It is also necessary to establish draining of the bathroom correctly. The drain hole in the bathroom has to be not higher than 10 cm over floor height. If it is higher, then it is necessary to provide special podium or support for jacuzzi.

6. Order of connection of jacuzzi by masters such: connection to plumbing and sanitary, connection to the power supply network, installation of bowl of the bathroom in the place closely to wall. Then it is prisverlivat to floor, and seams between wall and the bathroom close up special neutral or sanitary sealant.

7. Surely make test inclusion of the bathroom and check work of all its modes.

Author: «MirrorInfo» Dream Team