How to make the sidewalk

How to make the sidewalk

Quite often people think what material to apply to creation of the sidewalk. At the moment the paving slabs enjoy wide popularity. Special attention needs to be paid it to laying. If to meet all necessary conditions, then it will serve long enough.

It is required to you

  • the Bulgarian with cutting wheel on stone, the leveling cord, brush for sweeping, the hammer, pegs, level, guides, the rule for sand leveling, sovok and spades, the vibrating plate with pad.

Instruction

1. So, it is possible to get to work. For a start accurately everything needs to be planned. Make measurements of the site and apply them on the plan. After that are engaged in calculation of necessary quantity of tile for laying. It is also necessary to count necessary amount of raw materials for the basis. Then the site is marked according to the plan. Pegs and cords are usually applied to marking.

2. Further dredging is carried out. For this purpose normal shovels are used. It becomes so that after laying is executed, the front surface reached the set level of the site.

3. Much attention needs to be paid to bias and drainage. Under tile "swamp" should not be formed. The covering has to be with bias. Also best of all than everything to make branch for rain water. If the tile constantly is in water, then it will serve no more than 2 seasons.

4. Now it is possible to be engaged in the device of the bearing layer. In the basis the drainage bearing layer becomes. Material, frost-resistant, uniform in granularity, is applied to this purpose. It needs to be applied evenly on all plottage. Surely after these actions the check of surface of the basis is carried out.

5. Further it is possible to start laying. The tile has to be laid on the leveled sand. It is the best of all to begin with the right corner. It is not recommended to be engaged in laying during rain. During the work it is necessary to press tile to basis surface. If it is necessary, it is possible to line with rubber mall slightly. The subsequent tile needs to be leveled across, rather previous on level. Constantly check tile surface level. It will be necessary to lift some sites, and some – on the contrary, to lower.

Author: «MirrorInfo» Dream Team