What documents are necessary for connection of electricity on the uninhabited site

What documents are necessary for connection of electricity on the uninhabited site

Access to current network on the seasonal or uninhabited dacha - option useful, but not obligatory, and not all buyers of the earth check availability of these communications at once. And if it has turned out that on your site electrical equipment is not installed, you should provide the documents confirming opportunity and regularity of such connection.

  • The documents confirming possession of the parcel, the plan of the parcel, the reference, the project of power supply, acts of the performed works and compliance, protocols of checks of the equipment

1. The first step to which you should go - to receive from the company which is responsible for electrification of your area (as a rule, it is the Mosoblgosenergonadzor, Energosbyt or regional institutions of these organizations), the letter with a request to give you specifications for connection of electricity to the site. Without fail enclose to all documents for the site this letter: documents for the earth, the plan of the parcel, the certificate of availability on your earth of any other communications (waters, gas and so on). Under the law within month these documents have to be considered, after that will send you to the specified address the list of specifications for electrification of the site.

2. Preparation of the project of power supply of your site will become the following step - it is the document containing complete description of all stages of connection and operation of the power supply network which is created according to the existing standards, standards and those specifications which have sent you. All subsequent works have to be performed in strict accordance with this project. He is coordinated in the instance which has given you specifications.

3. After the approval of the project and carrying out all installation works you should receive acts for these works and their compliance to the provided project. Besides, specialists of the checking commission have to make sure of quality of the carried-out works - their conclusion is made out in the form of the reference or the protocol of check. Only after the end of all works and receiving on hands of all necessary documents you can address to the regional control authority behind current networks with request for connection of electricity for the site again.