As most to make the well

As most to make the well

The well is a need for any private house or giving. Water is required both for drink, and for watering of a kitchen garden, and for a bath or the pool. But to drill the well, using services of various enterprises and organizations, not all on a pocket. It is possible to equip the well and independently.

Instruction

1. Take an asbestos-cement pipe and drill openings with a diameter of 10 mm in its lower part. They have to cover all area of a pipe below - about a meter or one and a half - and to be located in chessboard order. Then, also in the bottom of a pipe, at distance about 25 cm from each other saw through circular flutes. They should not be through. These flutes will be required for fastening of a grid for wells by means of a copper wire, the wire should not be given and hinder the movement of a pipe. Grind the lower part of a pipe so that something turned out like a funnel. Then the pipe will go soil better down. Now the end of a pipe can be wound with a grid for wells and will fix this grid by a wire.

2. Put on a scrap of other pipe the lower part of a pipe, metal. Its length has to equal about 25 cm, and diameter to be a little more than diameter of an asbestos-cement pipe outside inside. By means of the welding machine in the middle of a scrap of a pipe weld a wire - a rod iron. Its diameter has to be 5 mm. It is an emphasis which will not allow a scrap to come off an asbestos-cement pipe or to slide on it. When the scrap is put on a pipe, the grid for wells will be fixed on the place densely.

3. Dig out a deep hole, ship in it a pipe. Then insert a zhelonka into the top opening. Further slowly and carefully choose soil from the well. When soil cleans up, the pipe will plunge down. To facilitate efforts, use the lever, but do not beat a pipe that it did not crack. When one pipe completely to plunge into soil, set on it other asbestos-cement pipe. It is necessary to do the same it - with a scrap and an internal emphasis. It is necessary to edify a pipe until there is a lot of water. Then it is necessary to throw into the well a kapron sack with cement. It will seal a bottom that water came to the well only through the openings drilled in a pipe.

Author: «MirrorInfo» Dream Team


Print