How to lay floor

How to lay floor

Each new settler and just good owner of the dwelling dreams of that arrangement of the house has been expedited, is qualitative also without special pollution. It belongs also to the device of floors – to one of the most important and labor-intensive processes under repair at home. Floors – not simply floor covering in which there are color and the drawing and is first of all plain, strong surface which has to serve long. Modern floors have wooden blank or the floor tie is made by concrete.

Instruction

1. For cement surface take the self-leveled floor tie, other name – level weight. Fill in it over draft cement screed. As a result you receive ideally plain surface which after hardening is suitable for laying of laminate, linoleum and any other floor covering. However, if to stack covering directly on tie by means of any glue, it will lead to the fact that your laminate or linoleum will just lie on concrete bed without fixing after a while. That it has not occurred, lay interlayer, for example, plywood or chipboard.

2. The method of laying of floor covering on draft floor which is leveled with the help log is widely applied. Logs in the form of thick boards and bar fasten anchors to the basis, and from above it is necessary to lay draft floor which is made of plywood or boards. Alignment needs to be made installation of special wedges and podstrugivaniyem log.

3. For installation of adjustable floors take wooden logs which fix on the basis on plastic bolts racks. By means of rotation of bolts racks around axis achieve equal covering. Fix logs and establish flooring on which lay the floor covering chosen by you. This technology excludes dirty processes and accelerates drying process, has high reliability and speed of production.

Author: «MirrorInfo» Dream Team


Print