As it is correct to put up fence

As it is correct to put up fence

There are different types of fences. One of the most widespread are those which are executed from professional flooring. Also on adjacent sites protections from grid chain-link are applied. Correctly to put up any fence, it is necessary to begin with mounting of columns for it.

Installation of columns for fence

Metal columns (profile pipes of 60х60 mm) will be necessary. They are strong and reliable. On them (for fastening of grid chain-link) there have to be hooks on which the grid is suspended previously (on each column two hooks are required - in the top and lower parts. Columns will connect among themselves metal logs (profile pipes of 40х20 mm).

From the first established column it is necessary to pull rope until the end of fence. It is necessary to establish other columns on one piece. For each of them it is required to dig out hole of 0.5 m in depth, then to hammer column with sledge hammer approximately on 1 meter into soil. Thus, the general depth in the earth has to be 1.5 meters. Column height from the earth has to be about 1.8-2 meters.

It is necessary to hammer column two, one people hold it that it has not deviated aside, and another works with sledge hammer. It is necessary to apply construction level to exact installation. The distance between columns is done by about 2 - 2.5 meters (for ensuring durability).

Installation of fence from sheets of professional flooring

For fence usually use the sheets having length of two meters. If desired it is possible to raise the level of their fastening above on small distance, having created for this purpose from below basis from concrete. It will become reliable support. When columns are established, to them fasten metal logs - from below and from above (are welded) (it is possible also in the middle). Then strengthen columns (crushed stone or gravel). If holes are dug out by shovel, their bases can be filled in with concrete. All design is coated on metal. Fastening of professional flooring needs to be carried out through each two "waves" on rivets or on self-tapping screws. It is necessary that joints of sheets were imposed at each other on 1-2 "waves".

Installation of fence from grid chain-link

To dig hole of 0.5 m in depth, to chuck in column the same size. The distance between columns has to be 2.5 meters. Their bases are required to be condensed, filled in with concrete mix. To paint columns then to define upper part of roll (grid), then to roll he (she). Further to suspend on hooks, it is accurate and reliable to connect rolls among themselves lashing wire that the position of joint was imperceptible. It is necessary to pull well grid, and to bend hooks, to press densely to columns. The fence is ready!

Author: «MirrorInfo» Dream Team