Your giving can become truly heavenly spot if there to build the pool. In hot weather it is simply irreplaceable, in particular if you are very engaged at kitchen garden and you have no time to run on the small river. It is very good if on the site there is reliable water source. The best option — already ready water supply system, but it is possible to make also tank for rain water. The pool can be built practically on any seasonal dacha. Its size depends on the area of the territory and desire of the owner.

It is required to you

  • - shovel;
  • - polyethylene film;
  • - level;
  • - measuring tools for earthwork operations;
  • - pegs or pieces of pipes;
  • - rope on pool perimeter;
  • - armature;
  • - iron stakes for attachment of fittings;
  • - concrete;
  • - pipe with valve;
  • - ceramic tile or tile from artificial stone;
  • - tool for polyethylene welding.

Instruction

1. For the small temporary pool choose the flat site. Skim the turf. Dig out ditch of the size necessary for you. To make pool for the child, will be ditch the sizes of 2х2 m enough and such depth that the kid could stand freely and his head at the same time would be over height of water. If the small child, then water has to it be not higher, than on belt.

2. It is very good if ground is clayey. But anyway cover bottom the polyethylene film intended for hotbed or the greenhouse. If film insufficiently wide, weld it to close all area of the pool one leaf. On coast of edge of film impose removed when digging ditch by the turf and stones.

3. It is not really convenient to get out of the polyethylene pool because wet polyethylene becomes slippery. Therefore on perimeter of the pool hammer pegs or pieces of pipes and pull between them rope. It will allow you or to the child without problems to get out to the coast. Fill the pool with tap water through hose or rain of tank store. Such pool can serve 1 year as after winter the film becomes brittle. It should be replaced.

4. Begin construction of the constant pool with the choice of the place. You should not build it in the lowland. It will complicate care for it. Choose the sublime place. It is better if there is clayey ground. When digging ditch consider that the dock apron has to have bias towards one of corners in which draining is mounted. The bias can be small, but not less than 0.5 m from the high region of the pool. It becomes for cleaning simplification.

5. The draining pipe equipped with valve is mounted prior to concreting of bottom, along with installation of armature. It is necessary to provide possibility of installation at once on outflow branch pipe of rubber hose as it is rational to use the water drained from the pool for watering of garden or kitchen garden.

6. Lay armature on bottom. Usually it represents iron grid in 1 layer which in addition is fixed by the wire rods 40 cm long hammered into bottom. Concreting of bottom it is possible to move without timbering. Walls of the pool can be laid out brick on cement slurry or to make of reinforced concrete, previously having welded framework. In this case the timbering is required.

7. Upon completion of concrete work and tie of bottom revet bowl of the pool with tile from artificial stone or ceramic. The ceramic tile has to be obligatory for external facing works. It is the best of all to get short flights of stairs for descent to the pool aluminum or from stainless steel. They are mounted along with concreting of sink of all construction. The submerged parts of ladders need to be buried in bottom in order to avoid injuries. Supply drain hole with protective screen. It will prevent hit in draining of accidental garbage.