According to the Russian Federation Government decree behind number 83, all houses and sites have to be connected to the central water supply. If near holiday village there does not pass the center water supply system, it is possible to make local water supply from the well which will differ in nothing from central, or to build well.

It is required to you

  • - the allowing documents for connection to the central water supply;
  • - services of specialists in well-drilling or in digging of wells;
  • - reinforced concrete rings or felling from deciduous breeds of tree;
  • - pumping station;
  • - pipes;
  • - couplings, sgona, rings, collars

Instruction

1. To be connected to the central water supply if it takes place near the seasonal dacha, address in regional water utility. Submit the application, show documents for the site, the copy of the cadastral plan, pay the receipt for connection to water and also installation works for insert in the center water supply system. All works to you will be carried out by the licensed experts from water utility.

2. To make local water supply of giving when to connect the centralized water supply system there is no opportunity because of its absence, call specialists in well-drilling. Buy the pumping station. To you in one day will make drilling and mounting of the pump. Such water supply practically differs in nothing from central. You will be able to connect to it washing and dish washers, titans, to plumber, to establish shower cabin. Generally to connect all that you will consider necessary for comfortable stay on the seasonal dacha.

3. And the last option to make water supply at the dacha is to dig well. Works on digging of wells very difficult and costly, and experts have to make them.

4. Strengthen well walls reinforced concrete rings or establish in well felling from deciduous breeds of trees. If you do not want to attract team of specialists in digging of well, dig it independently manually or the tractor.

5. After completion of works strengthen walls in order to avoid collapse at once. At manual digging and installation in quality of the strengthening walls of felling you perform works on its installation in process of carrying out earthwork operations.

6. Pour out bottom of well drainage pillow. For this purpose fill thick layer of bank sand and over it thick layer of river pebble.

7. Pump out all first water which has come to well. You will be able to use well in process of its filling, that is not earlier than in 7-10 days after completion of all works.

8. For water supply use the submersible well pump which you will turn on as required for watering and filling of tanks or lay on water by means of pipes and install the accumulative pumping station.