How to stack tile on floor

How to stack tile on floor

Laying process – important stage of creation of ceramic floor. It is obvious that even expensive qualitative tile which is laid carelessly will look ugly. When laying tile on floor it is necessary to have at least a little experience.

It is required to you

  • - tile;
  • - mastic;
  • - tape measure;
  • - rubber palette;
  • - foam sponge;
  • - rope.

Instruction

1. Prepare material, make measurement of the square on which you are going to put tile. Buy all necessary materials.

2. Prepare facing surface. The more carefully floor will be prepared, the work will be made more qualitatively. Also the quality depends on the term of operation of ceramic covering.

3. Before beginning to lay tile on the floor, carefully distribute the scheme of laying. For this purpose lay two rows, perpendicular on axes. Between tiles insert crosses that the distance between seams has been considered.

4. Stack tile not on cement slurry and not on solution of dry glue, and on bituminous mastics. Mastic allows to hold more reliably product on floor.

5. Do not use a lot of water under enamel layer because unpleasant defects can appear further. Try to distribute correctly solution on floor.

6. As in the last row the tile, perhaps, will not be necessary whole, it should be cut accurately. To give to the room elegant exterior, when laying tile on corners establish decorative profiles.

7. When facing floor in the bathroom it is possible to face problem that between wall and the bathroom there is big gap, in that case make outflow of tile.

8. After laying of tile make finish of seams. Prepare the rubber palette and foam sponge. Very carefully clean seams from residues of glue, the established crosses, dust.

9. If the tile is laid incorrectly, without all recommendations, prepare for what since the time of tile will drop out of flooring. Of course, it occurs not at once. and gradually.

Author: «MirrorInfo» Dream Team


Print