How to warm ceiling

How to warm ceiling

Warming of ceilings is in great demand among consumers today. If you have started repair, for certain you want to know how to warm ceiling it is correct. It is very easy to invite experts and to order professional warming. But if you have no enough funds, the question changes a little – how to warm ceiling independently, without resorting to services of experts?

How independently to warm ceiling: we choose material   For a start it will be required to solve what warming material to use. In hardware stores well there are a lot of decisions. Professionals advise moisture resistant, fire-resistant heaters. It is worth choosing accurately and carefully this building material. The main thing that heater was whole, differently its efficiency will significantly decrease. There are several the most known warming materials: haydite, minvat, slag and mix of sawdust with lime. Warming with use of minvata enjoys the greatest popularity.

It should be noted that heaters have different temperatures of efficiency. For example, seven centimeters of minvata will be enough for marks to minus thirty five degrees. Over twenty centimeters of slag will be suitable for temperature minus thirty degrees. About six centimeters of ceramsite sealant will also approach for minus thirty degrees.

As it is correct to warm ceiling

  • Preparation of all necessary tools and building materials will be the first stage of work. Rails about 20 mm, nails of "twenty", eaves boards, edge or knife, the hammer and also electric fret saw or saw will be required. Also polyfoam and paper roof covering is required.
  • Preparation of water isolation will be the next stage. Paper roof covering is cut by strips. Width has to be equal to distance between frame elements with blousing to seven centimeters.
  • Further it is required to lay polyfoam. Plates of this building material have to keep strong between beams. It is required to close up all openings between sheets of polyfoam polyurethane foam. This design should be covered with paper roof covering again.
  • Then to lay minvata in two layers so that the second layer closed joints of the first.
  • The warming upholstery boards will be completion phase.

Author: «MirrorInfo» Dream Team