How to construct an ice slope

How to construct an ice slope

To ride from hills is an ancient tradition in Russia in the winter. In old times such entertainment made special sense. People considered that driving from hills is capable to awaken vital forces. Really rapid descent from an ice slope takes the breath away, gives fun and the child receives a considerable charge of cheerfulness.

It is required to you

  • water,
  • watering can,
  • board,
  • shovel,

Instruction

1. For children of preschool age height of an ice slope has to be 1 m. For younger school students – 1.5 m. Do not do a descent tilt angle more than 40 degrees. The big angle of descent is injury-causing.

2. For construction of an ice slope pay special attention to the choice of the place. It has to be safe for children – well lit and the exit with the mountain should not be directed towards the highway.

3. On the chosen place begin to store snow for the hill. After that a basis it is necessary to stamp and give the necessary form carefully. It is necessary to provide sides and steps for the hill - they need to be made of a sleet. The received basis has to be defended within two days.

4. Wait for frosty day with a temperature minus 20 degrees and begin to fill in a basis. Water water from a watering can, but not from a bucket. Waters will leave much, but such hill will stay all winter.

5. Mix in a bucket snow with water before formation of kasheobrazny dense weight. Over warm gloves put on rubber and start a zadelyvaniye of the holes formed after watering.

6. After a zadelyvaniye of holes cover with snow porridge all hill. Let's the received construction stiffen.

7. Again make snow porridge and lay out on the hill. Now level the surface of the hill a smooth board. Periodically let's stiffen to each layer.

8. Especially pay attention to smoothness of the vykat from the mountain. Transition from top until the end of descent has to be smooth. Therefore carefully, periodically watering, manually smooth all roughnesses.

9. That children slid as it is possible further, make a final part of descent of snow porridge. Properly smooth it.

10. Before a final stage of construction it is necessary that the hill was defended night. Further flood the hill with water. Fill in in cold weather, and it is better at night.

11. The main advantage of an ice slope is a minimum of expenses and a possibility of participation in construction of a construction of children. Children always with pleasure take part in construction of the hill.

Author: «MirrorInfo» Dream Team


Print