How to build the house of glued bar

How to build the house of glued bar

Application of glued bar at construction allows to build houses not only for seasonal rest, but also for permanent residence. Structures from this material differ in high strength and safety for health. To build the house of glued bar, it is necessary to complete all stages competently.

It is required to you

  • - glued bar;
  • - fasteners;
  • - material for the base;
  • - heater;
  • - waterproofing material;
  • - roofing material;
  • - wood for furring;
  • - pipes for utilities;
  • - material for performance of electrical work;
  • - tools;
  • - ladder;
  • - step-ladder.

Instruction

1. Pick up the project you domarassmotrit various options of houses from glued bar. Stop the attention on the ready project which as much as possible considers your wishes and financial opportunities. Deliver necessary material for construction and be engaged in preparation of the site. For this purpose it is necessary to clear away site under future building, to carry out its alignment and to make marking of borders of the house.

2. Put fundamentsooruzheniye from glued bar have rather small weight, and therefore allow to apply the low-buried views of the bases: tape, pile and drilling. To choose any given design, it is necessary to consider weather conditions of the area, type of soil and level of underground waters. For example, the pile base will be suitable for peat bogs and sites with bias. It is optimal variant for buildings of this kind, besides it is inexpensive and strong. Carry out its waterproofing – it will become protection against influence of soil moisture.

3. Build korobstroitelstvo it is carried out from the special elements adjusted to each other. If at your house collect not one floor, interroom partitions from the same bar, as wall. Take care of warming of joints and grooves – in them it is necessary to lay thermal insulation which will protect the building from penetration of wind and cold. Along with laying of walls carry out installation of beams of socle overlapping and make floors. At first lay counterfloor boards, on it - sheets of heater and layer of parogidroizolyation. Carry out flooring of clean floor after completion of the main assembly works.

4. Make krovlyupo achievement of the necessary height close box ceiling beams, and install rafters. Protect garret space from cold, having laid on overlapping and on rafters heater - mineral wool. Close rafter design roof.

5. Mount engineering sistemydlya ensuring comfort mount communications: water supply, heating, sewerage. Use for this purpose modern metalpolymeric or polyethylene pipes – they will provide reliability at operation. Pay special attention to electrical generating system. Lay wires in overlappings in corrugated metal sleeves, on the walls and ceiling - in plastic channels.

6. Carry out final you rabotynastelit finished floor, establish windows and outer doors. Close interroom apertures in the last turn not to damage finishing of door cloth. Buildings from glued bar do not need interior and external finish. But if desired it is possible to use for this purpose any modern finishing material. Cover surfaces with colourless lacquer – it will effectively emphasize the invoice of wood. In completion of assembly of the house establish wooden porch.