How to melt ice in the sewerage

How to melt ice in the sewerage

Winter season gives not only positive emotions, but sometimes leaves also unpleasant feelings. Provide for instant that at you the sewerage has frozen: here not to fun, if at once not to undertake something, then consequences can be serious. First of all, it is necessary to defreeze ice in the sewerage.

It is required to you

  • - steel rod;
  • - the stretcher delay;
  • - insulating tape;
  • - white metalplastic;
  • - electrical wire.

Instruction

1. Manufacture the heatelectric heater (TEN) the hands. For this purpose bend steel rod twice and by means of the stretcher delay and insulating tape connect it to wire. Wind with wire of metalplasticity, and later fix this electrocable on plastic pipe, having carefully wound it with insulating tape.

2. Define the place of freezing of sewage pipe. Open intermediate well between the house and the general sewage pipe and check whether run-off water from the house arrives here. Perhaps, the pipe was chilled directly under wall: in this case the intermediate well and the sewage pipe leaving the house will be dry. So, it is necessary to warm the pipe bringing waste waters out of the house. If in intermediate well sewage which does not pass have accumulated, ice is in the pipe connecting intermediate well to the general sewage pipe.

3. Place TEN in the pipe cleaned from sewage in which the stopper was formed. Thrust against the stop. After it include plug in the socket. You will see already soon how from pipe the thin stream of melt water will exude. In case the warmed metal sewage pipe (with diameter of 15 centimeters), execute advance of TENa in 2.5-3 hours and if clay pipe – 4.5-5 hours. Before moving TEN, surely deenergize it. And so continue the procedure until waste waters do not begin to go to the sewerage freely.

4. It is the best of all to begin to carry out firing up of ice in sewage pipe at night: late at night establish TEN in the chilled pipe, include it in the power supply network and leave for the night. Then change the provision of TENa in the morning. Following shift of position of the heater? on return from work and so on.

5. Follow rules of electrical safety, perform all works only in gloves.

Author: «MirrorInfo» Dream Team


Print